Please ensure Javascript is enabled for purposes of website accessibility

Dignity Health at Bakersfield Memorial Hospital
Hybrid Catherization LAB #3 / CVOR


Dignity Health at Bakersfield Memorial Hospital Hybrid Catherization LAB #3 / CVOR

Dignity Health Bakersfield
420 34th Street
Bakersfield, CA 93301

  • PROJECT DESCRIPTION

  • PROJECT INFORMATION

The scope of work included the complete demolition and remodel of the existing Cath Lab #3, control room and office area located in the Cath Lab Department at Bakersfield Memorial Hospital. Bakersfield’s first and new state-of-the-art hybrid Catherization Lab #3 / CVOR at the Sarvanand Heart & Brain Center features a combined cath lab and operating room suite including equipment room, control room and pump room. The hybrid capabilities of the new lab/OR bring advanced procedures best delivered in an integrated room allowing both surgical and intravascular procedures to occur sequentially or simultaneously, without moving patients from one procedure room to another.


Tags


You may also like

Taft College – Student Center

Taft College – Student Center
{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}